/ We will do attentively..   Collection / Supposes / E-mail / Site map
Warm congratulation Cie auto source industry co.,ltd website clear~
 Product List

Auto Bearings


Front Wheel Hub Bearings
  Rear Wheel Hub Bearings
 

Tensioner&Idler Bearings

 

Clutch Release Bearings

 

Wheel Hub Bearing(One Generation)

 

Wheel Hub Bearing( second generation)

 

Wheel Hub Bearing ABS System

 

Water Pump Bearing

 

Automotive Tapered Roller Bearings

 

Steering Wheel Bearings

 

Universal Joint Kits

    Automobile Center Support Bearing
  Steering Gear Box Bearings
  Special Non Standard Auto Bearing
  Automobile Alternator Bearing
  Automotive Air Condition Bearings

Industry Bearing


Deep Groove Ball Bearings
  Angular Contact Ball Bearing
 

Cylindrical Roller Bearings

 

Self-Aligning Ball Bearing

 

Spherical Roller Bearings

 

Tapered Roller Bearings

 

Bearing Units

 

Thrust Bearings

 

Needle Roller Bearings

 

Linear Bearings

 

Special Non Standard bearings

Power Transmission Parts


Ball leading Screw

 

Linear Motion Shaft

  Linear Guide Rail and Block Assemblies
  Precise Crossing Guide Rail

Auto Steering Gears


Worm and level Steering Gears

 

Rack and Pinion Type Steering Gears

 

Recirculating Ball Type Steering Gears


  Industry News

Ballscrew takes to the sky Federal-mogul blacksburg layoffs continue How to replace a steering gear Koyo cuts back at U.S. bearing rants
PI's M-122 palm-top-sized precision R.T. gilman new linear guide slides Schaeffler's generation C deep groove ball bearings
SKF ball screw and roller SKF long lead ball screws Special coated spherical roller bearings Steering conversions

SKF® Long Lead Ball Screws Deliver High Linear Speeds with Less Noise

FEATURING UNIQUE BALL CIRCULATION SYSTEM:
Ball Screws deliver high linear speeds with minimal noise.
Ball Screws deliver high linear speeds with minimal noise.

SKF® long lead ball screws feature a unique ball circulation system designed to promote high linear speeds and low noise levels. These ball screws are ideally suited to provide precise positioning in a wide range of linear-actuation applications, including packaging and automation systems, laser cutting, woodworking, and production machinery, among others.

Long Lead ball screws are available with a nut with axial play (Series SL) or with backlash elimination (Series BL) to achieve the desired operation. Smooth performance is enhanced with the optimized end cap ball recirculation system.

The standard product range also includes a rotating nut design (Series SLT and BLT) for applications where critical speed or inertia is an issue. The SLT and BLT rotating nut option is a design that allows the drive motor to move with the nut, which results in reduced inertia, less required power, and even higher linear speeds up to 110m/min.

Long lead ball screw diameters range from 25mm to 50mm and leads range from 20mm to 50mm.

All SKF long lead ball screw assemblies can be equipped with the necessary end machining and with the support bearing package pre-assembled and ready to go. They can further be customized with double protection wipers and brush wipers in both cylindrical or flanged nuts configurations. Standardized long lead screws users can be customized to satisfy any particular application specifications



bearing

Workshop | Products | Contact |
Copyright © Cle auto Source Industry Co.,Ltd. All Rights Reserved. Design By China Manufacturer